Workshop/steel
Construction works in progress
Design author's supervision
Detailed Design of the Steel Structure for Chip Conveyor Supports (Vecoplan)
The primary structural system of the transfer tower consists of a vertical spatial truss.
Columns and horizontal beams are made of HEA sections, while bracings and struts are made of SHS closed profiles.
The staircase structure is horizontally connected to the transfer tower.
The total height of the tower is approximately 31 metres.
realisation: 2022 - 2025 yr
area: 25 000 m2
ul. Królowej Jadwigi 192a 30-212 Kraków